Quoting from the TAR’s transportation department, Kangba TVreported: “except Songduo Tunnel and Milashan Tunnel, Lhasa-Nyingchi High Grade Highway has been well prepared and begins trial operation from October 1.”
The four-lane Lhasa-Nyingchi High Grade Highway is 398 km long; it is designed for a 80 km/h speeed.
No comments:
Post a Comment